| 1 | Precommissioning and commissioning of new marine loading arm | SGP at AGP Ruwais site | ADYARD | Completed | 2020 |
| 2 | Acoustic simulation and mechanical response analysis of reciprocating compressor | ADNOC Ruwais site | BSS Tech | Completed | 2020 |
| 3 | Chlorine decay analysis in water distribution network | ADDC water network | TECHTON Engineering | Completed | 2020 |
| 4 | Precommissioning and commissioning of third molecular sieve vessel | At ADNOC Buhasa | ADYARD | Completed | 2020–2021 |
| 5 | Alarm Rationalisation study | ADNOC offshore facilities (UZ, LZ, GPF, NGTP) | WOOD Abu Dhabi / UK | Completed | 2020–2021 |
| 6 | DCS Scope of work for Alarm management software | ADNOC offshore facilities (UZ, LZ, GPF, NGTP) | WOOD Abu Dhabi / UK | Completed | 2021 |
| 7 | Pre-commissioning & commissioning project for BAB miscellaneous modification and enhancement project | ADNOC Gas Processing plants (Habshan-3 & Habshan-0) and ADNOC ONSHORE BAB CDS | Progetti Europa and Global S.P.A | Completed | 2021 |
| 8 | P&ID development and instrumentation datasheet preparation | ADNOC Gas Processing plants (Habshan-0, Habshan-1, Habshan-2) | WOOD Abu Dhabi | Completed | 2021–2022 |
| 9 | P&ID development and philosophy documents | ADNOC Gas Processing plants | Equilibrium (EEC) | Completed | 2022 |
| 10 | FIV studies for capacity enhancement of PWT system | ADNOC Offshore (South and North Island) | EIL, Abu Dhabi | Completed | 2022 |
| 11 | Alarm rationalisation study | ADNOC offshore facilities (WSP, NSP, SSP, GTU/CSP, WIP, PGP) | WOOD Abu Dhabi/UK | Completed | 2022 |
| 12 | Deputation of process engineer | BRIDGERS Abu Dhabi | Completed | 2022 | |
| 13 | Feasibility study for installation of flow meter for ejector performance evaluation | ADNOC offshore facilities (Umm Shaif and Lower Zakum) | BRIDGERS / TARGET | Completed | 2022 |
| 14 | Engineering for redundant deaerator installation | Emirates Global Aluminium (EGA) | Bridgers / MetalFab | Completed | 2022–2023 |
| 15 | AIV-FIV studies | ADNOC Gas Processing plants | Equilibrium (EEC) | Completed | 2022–2023 |
| 16 | AIV-FIV studies | ADNOC Gas Processing | ISCCO | Completed | 2022–2023 |
| 17 | Process engineering support for EPS-2 project | ADNOC Offshore | WOOD Abu Dhabi | Completed | 2023 |
| 18 | Precommissioning & commissioning for redundant deaerator | Emirates Global Aluminium (EGA) | METALFAB | Completed | 2023-2024 |
| 19 | E&I drafting services | Emirates Global Aluminium (EGA) | Dubai Engineering Co. LLC | Completed | 2025 |
| 20 | Design Review and Hydraulic Check for Hottpad System | Wafra JO Hottpad | NAPESCO (K.S.C.P) | Completed | 2024 |
| 21 | Pre-commissioning Service for Third Ball Mill | EGA, Al Taweela Alumina | Dubai Engineering Co. LLC (DECO), Sharjah | Completed | 2025 |
| 22 | HMI and Control System Upgrade for Rig Operation | PDO, Oman | Cyberloop, Australia | Completed | 2025 |
| 23 | KW Booster Pump – Process & Engineering Study for cavitation problem resolution | Emirates Steel, Abu Dhabi | Emirates Steel | Completed | 2025 |
| 24 | Process/HSE Engineering Support for P5 Project | ADNOC Gas Processing | WOOD Abu Dhabi | Completed | 2024-26 |
| 25 | Process Engineering Support | PESCO Office | PESCO | Ongoing | 2025-26 |
| 26 | Process Engineering Support for P5 Project | ADNOC Gas Processing | KENT | Ongoing | 2025-26 |